Pathway Plan
The credit-side follow-through on a Late-S1 Near-Miss / Pathway-Required gap: turns that one-session disclosure into a tracked plan — the exact credit change needed to reach Qualified for the scenario the borrower wanted, with progress tracked over time. The anchor capability of the S3 Nurture "Credit: the pathway to Qualified" arc, alongside Monitoring, the Simulator, and Threshold re-engagement. Turns the Always-Approved gap into a delivered outcome instead of a one-session disclosure.
| Audience | Name |
|---|---|
| Engineering (code) | — |
| Design (UI label) | — |
| Borrower-facing | — |
| Do not use | — |
Sources
- Clarity Engine PRD V7 — Requirement #31a
Related
Always Approved State, Credit Monitoring, Credit Simulator, Threshold Re-Engagement, Action Plan Steps, Action Plan Text
Referenced by
Always Approved State, Credit Monitoring, Credit Simulator, S3 — Nurture, Threshold Re-Engagement